Product>Detail
Chemical sheet with Double sided or one sided hot melt glue

Chemical sheet with Double sided or one sided hot melt glue

2015-08-31 10:30 641° Toe puff & Counter(stiffener sheet)

ApplicationMainly used for for the toe puff and back counter of middle& high grade leather shoes, sports shoes, working shoes& special technical shoes etc.

MOQ1000 sheets

Loading PortXiamen port

Sample Term


Thickness:0.6mm,0.8mm,1.0mm,1.1mm,1.2mm,1.3mm-3.0mm

Color: white or custom made

Size:0.914m*30Y,0.9m*1.5m,0.914m*30mor custom made

Feature:

One side or double side hot melt gluewith non woven chemical sheet based. 

Environmental with no toxic smell, easyoperation to improve the efficiency, 

good hardness and elasticity with highadhesive ability, can keep the original shape after repeating flex. 

Application:

Chemical sheet with Double sided or one sided hot melt glue Mainly used for for the toe puff and back counter of middle&high grade leather shoes, sports shoes, working shoes& specialtechnical shoes etc.

Operation method:

Before inserting in the upper and shoe lining, can pre-setting byhand. Will be better to use the hot and cold setting machine to shape.

Standard working conditions:

The temperature should be 80℃-170℃

Attaching time: 10-20 seconds 

Note: 

The temperature and timing based on the standard workingexperience, just for your reference. Definitely should be changed according tothe material thickness, upper material and working conditions. 

Packaging:

1.By sheet. 25sheets per poly bag.

2.By roll.30m per poly bag or others.

MOQ:1000 sheets 

Loading port:Xiamen port

Sample term: sample is free , we will pay all freight after first order .we can sent sample in 2 days 

Payment term: 

1.T/T (30% deposit and balance should be paid before delivery oragainst the copy of B/L ) 

2.L/C (30% advance payment before production, 70% by L/C atsight, if the country must need 100% L/C atsight, we must accept it also) .

Timely Delivery : usually about 10days , if customer needs very urgently ,we can finish production in 5 days . 

Previous:
Next: